Gacko II, Bosnia and Herzegovina
State-owned utility Elektroprivreda Republike Srpske, together with China Machinery and Engineering Corporation (CMEC) and Emerging Markets Power Fund, plans to build a new 350 MW lignite power plant in Gacko, near the town’s existing plant, and in December 2017 a Memorandum of Understanding was signed to move the project forward.

Stay informed
We closely follow international public finance and bring critical updates from the ground.
Background
State-owned utility Elektroprivreda Republike Srpske, together with China Machinery and Engineering Corporation (CMEC) and Emerging Markets Power Fund, plans to build a new 350 MW lignite power plant in Gacko, near the town’s existing plant, and in December 2017 a Memorandum of Understanding was signed to move the project forward.
As is too often the case in southeast Europe, there has been no convincing analysis proving that this plant is needed or that it would be the best way to provide Bosnia-Herzegovina’s energy supply in the coming years.
In April 2018 an analysis by economist Damir Miljević showed that fatal flaws in the input data make it highly likely the plant will generate losses. Three out of the main data inputs for the official feasibility study – the price of coal, electricity sales price, and the price of CO2 – are unrealistic:
-
- A realistic price of coal is mentioned in the study as just over EUR 18 per tonne – yet the amount used in the calculation is much lower, around EUR 13.3 per tonne.
- The Study foresees export of all the electricity generated, at a price of EUR 50 per MWh, except in exceptional cases when 30% would be sold on the domestic market at EUR 19.90 per MWh. There no evidence that the electricity would find a market and that it could be sold at this price – which is higher than the real export price in recent years. Moreover, the scenario including 30% of electricity being sold domestically is not even examined in the calculation – if it was it would show that the plant is unprofitable.
- A CO2 price of EUR 5 per tonne is mentioned in the text, but not included in the feasibility calculation. Including even this very low CO2 price in the calculation would take the plant into the realm of unprofitability.
- A realistic price of coal is mentioned in the study as just over EUR 18 per tonne – yet the amount used in the calculation is much lower, around EUR 13.3 per tonne.
The analysis concludes that although the official feasibility study for Gacko II claims it would generate profit of around EUR 23 million per year, with more realistic input data, a loss of minimum EUR 1.15 million per year looks more likely.
Gacko II is one of no fewer than five new coal power plants being pushed forward in Bosnia-Herzegovina, in addition to the 300 MW Stanari plant which went online in 2016. It is clear that not all of the projects can go ahead but so far the authorities are backing all of them, irrespective of the costs. However, as of January 2022, the project does not appear to have moved forward significantly and seems unlikely to go ahead.
Latest news
Poročilo CE Delft znižuje notranjo stopnjo donosa Teš 6
Bankwatch in the media | 28 November, 2011Neutemeljene predpostavke omogočajo večanje tveganj in če se ta uresničijo, lahko stopnja pade celo na 5,12 odstotka, je danes ob predstavitvi metodoloških napak investicijskega programa Teša 6 dejal Geert Warringa iz CE Delft.
Read moreIndependent analysis questions economic viability of TES 6
Press release | 28 November, 2011Ljubljana – An independent analysis commissioned by Bankwatch and Focus published today reveals a number of unsubstantiated claims and methodological mistakes in the investment plan for the TEŠ 6 lignite plant in Slovenia. Correct calculations show that the internal rate of return is in reality lower than estimated by the project promoter, state-owned TEŠ. Had the rate of return been calculated properly, the project would not have qualified for the EIB loan of 440 million euros it is set to receive.
Read moreProtest proti Teš 6
Bankwatch in the media | 20 October, 2011http://tvslo.si/predvajaj/dnevnik/ava2.118804865/#ava2.118804218;;
Read moreRelated publications
Air pollution and associated health impacts in Novaci, North Macedonia
Report | 6 April, 2022 | Download PDFFor the last forty years, the municipality of Novaci has been home to North Macedonia’s REK Bitola complex, which consists of a 675 MW lignite power plant, open-cast mines and ash disposal sites. Its inhabitants have been breathing pollution emitted at
Implementation of the Air Quality Directive by Western Balkan countries – 2022 update
Briefing | 14 February, 2022 | Download PDFThis briefing reviews the progress of five Western Balkan countries (Bosnia and Herzegovina, Kosovo, Montenegro, North Macedonia and Serbia) on the transposition and implementation of the EU’s Air Quality Directive
A Just Transition Fund for the Western Balkan countries
Report | 11 January, 2022 | Download PDFThe EU’s Just Transition Mechanism will mobilise more than EUR 100 billion in investments over the period from 2021 to 2027 to help countries shift their energy sources from fossil fuels to more sustainable ones. Part of this Mechanism is the Just Tran