Kamengrad lignite power plant, Bosnia-Herzegovina
An idea to build a power plant at the open-cast Kamengrad coal mine near Sanski Most in the Federation of Bosnia-Herzegovina has been around for years, but in 2017 it took a step forward with the November signing of a Memorandum of Understanding between Energy China International and the Bosnia-Herzegovina construction supplier Lager d.o.o. for a 2 X 215 MW plant.

Stay informed
We closely follow international public finance and bring critical updates from the ground.
Background
Few details are available about the plant yet, and it has no environmental permit and no financing. As with other plants across the region, unrealistic employment promises have already been made. In December 2017 head of the Sanski Most District Faris Hasanbegović stated that it would provide 1000 workplaces.
This does not appear to have convinced local people, however. As it would be a new power plant, it has attracted much more opposition locally than most other planned plants in the country. Sanski Most is located on the beautiful river Sana and prides itself on having no fewer than nine rivers in the district altogether. As a scenic and green area many of its residents feel that the power plant will spoil its potential for agriculture and tourism rather than bringing prosperity.
Latest news
Dobrovoľne behali okolo uhoľnej elektrárne. Uprostred panorámy sa objavil obrovský hríb dymu, hovorí bežec
Bankwatch in the media | 15 January, 2021Skupina bežcov sa rozhodla zabehnúť trasu okolo uhoľnej elektrárne v Severnom Macedónsku, aby poukázali na znečistenie ovzdušia v okolí.
Read moreRunners raise the alarm about air pollution from coal power during inaugural Lung Run
Blog entry | 22 December, 2020One of the leading reasons for the extremely polluted air are the outdated and substandard coal-fired power plants in the region. The 16 plants operating in the Western Balkan countries emit as much sulphur dioxide and dust pollution as the entire fleet of coal plants in the EU.
Read moreTime to end the damaging cycle of land, surface and groundwater pollution in Tuzla
Blog entry | 21 December, 2020There are few things one can be sure of in life, but the constant anxiety communities near Bosnia-Herzegovina’s Tuzla power plant experience is one of them.
Read moreRelated publications
Complaint regarding the EIB loan to Sostanj lignite power plant TES6
Official document | 28 February, 2011 | Download PDFThe complaint, filed with the European Investment Bank by Focus Association for Sustainable Development (SI) calls on the bank to withdraw its approval for the project. The complaint addresses the following aspects: premature disbursement of funds failure to assess the project’s compatibility with the 2050 climate targets misleading claims that TEŠ 6 is only a replacement and not an expansion missing clear governmental support to the project
Pointers for the EBRDs forthcoming mining sector strategy
Policy comments | 20 November, 2010 | Download PDFThe document summarises the goals on which, according to Bankwatch, a future EBRD mining sector strategy needs to be based if the EBRD wants to support sustainable development. It includes specific recommendations to help ensure that EBRD investments in the mining sector bring real benefits for communities, avoid environmental and social harm, reduce CO2 emissions and do not increase countries’ dependence on commodities.
Comments on the Environmental Impact Assessment of Sostanj thermal power plant project
Policy comments | 15 February, 2010 | Download PDFThese comments by Slovenian NGO Focus – Association for Sustainable Development outlines concerns regarding the Sostanj project’s financial picture and its compliance with the climate and energy objectives of Slovenia. They also express serious doubts about the actual necessity of the project.