Kamengrad lignite power plant, Bosnia-Herzegovina
An idea to build a power plant at the open-cast Kamengrad coal mine near Sanski Most in the Federation of Bosnia-Herzegovina has been around for years, but in 2017 it took a step forward with the November signing of a Memorandum of Understanding between Energy China International and the Bosnia-Herzegovina construction supplier Lager d.o.o. for a 2 X 215 MW plant.

Stay informed
We closely follow international public finance and bring critical updates from the ground.
Background
Few details are available about the plant yet, and it has no environmental permit and no financing. As with other plants across the region, unrealistic employment promises have already been made. In December 2017 head of the Sanski Most District Faris Hasanbegović stated that it would provide 1000 workplaces.
This does not appear to have convinced local people, however. As it would be a new power plant, it has attracted much more opposition locally than most other planned plants in the country. Sanski Most is located on the beautiful river Sana and prides itself on having no fewer than nine rivers in the district altogether. As a scenic and green area many of its residents feel that the power plant will spoil its potential for agriculture and tourism rather than bringing prosperity.
Latest news
Suspension or no suspension, the EBRD freezes disbursements for the Šoštanj lignite power plant
Blog entry | 18 April, 2012With the decision to freeze the disbursement of a loan for the Šoštanj lignite power plant in Slovenia, the European Bank for Reconstruction and Development seemingly reacts to the many controversial points Bankwatch and other organisations have raised about the project.
Read moreCampaign asks UniCredit to ‘get out of coal’
Blog entry | 12 April, 2012Pressure is growing not only on international financial institutions but also on private banks to stop financing fossil fuels.
Read morePrljavi novac i slovenska termoelektrana
Bankwatch in the media | 28 March, 2012Državna komisija upozorava da je korupcija mogla utjecati na dodjelu ugovora o izgradnji novog bloka u termoelektrani Šoštanj.
Read moreRelated publications
Pollution of land, surface and groundwater near the slag and ash disposal site of Tuzla thermal power plant
Study | 18 December, 2020 | Download PDFFrom 1 March – 31 August 2020, an analysis of water and soil samples was conducted in the area of influence of the closed slag and ash disposal sites in Tuzla, Bosnia and Herzegovina (BiH) – Plane, Divkovići I, Divkovići II, Drežnik and Jezero I – as w
Pathways for Just Transitions in South East Europe
Policy comments | 14 December, 2020 | Download PDFThis policy paper is a companion piece to “Accelerated Lignite Exit in Bulgaria, Romania and Greece”, a report published in May 2020 modelling the impact of the early retirement of some coal and all lignite power plants in the electricity sector in the three countries.
Chinese-built coal projects in Europe
Briefing | 14 September, 2020 | Download PDFA real and immediate threat to the EU’s decarbonisation efforts