• Skip to primary navigation
  • Skip to main content
  • Skip to footer

Bankwatch

  • About us
    • Our vision
    • Who we are
    • Donors & finances
    • Get involved
  • What we do
    • Campaign areas
      • Beyond fossil fuels
      • Rights, democracy and development
      • Finance and biodiversity
      • Funding the energy transformation
      • Cities for People
    • Institutions we monitor
      • European Bank for Reconstruction and Development
      • European Investment Bank
      • Asian Infrastructure Investment Bank
      • Asian Development Bank (ADB)
      • EU funds
    • Our projects
    • Success stories
  • Publications
  • News
    • Blog posts
    • Press releases
    • Stories
    • Podcast
    • Us in the media
    • Videos
Home > Projects > Tuzla 7 lignite power plant, Bosnia and Herzegovina

Tuzla 7 lignite power plant, Bosnia and Herzegovina

CANCELLED: The 450 MW Tuzla 7 project has become an iconic example of the clash between Chinese-backed investments and EU standards in the Balkans. The lead contractor was to be the China Gezhouba Group Co. and a financing deal was signed with the China ExIm Bank in November 2017. However, in April 2024, the cancellation of the works contract was reported to have taken place.

This is an archived project. The information here may be out of date.
Learn more about our current projects and sign up for the latest updates.

Three cooling towers from the Tuzla lignite power plant.
The lignite-fired power plant in Tuzla. (Image by flickr user melisabeth - CC BY 2.0)

Stay informed

We closely follow international public finance and bring critical updates from the ground.





Background

For almost two decades, a new 450 MW unit was planned at the Tuzla coal power plant in Bosnia and Herzegovina, owned and operated by the entity-owned Elektroprivreda BiH. 

In 2021 it was announced that GE had pulled out as equipment supplier and that Gezhouba was offering alternative Chinese technology instead, putting the future of the project in doubt. In December 2023, Federal Prime Minister Nermin Nikšić confirmed that the project definitely would not go ahead, but stated it was unclear whether an agreement would be reached on terminating the contract or whether arbitration would be sought. In April 2024 it was reported that the contract had been cancelled and later in the year, Elektroprivreda BiH published a business plan without the unit in it. 

Poor economics and the threat of stranded assets

An Engineering, Procurement and Construction (EPC) contract worth EUR 785 million was signed with China Gezhouba Group Co. on 30 August 2014, but it was later admitted that the plant would not be economically feasible. An annex to the contract signed on 04.05.2016 was reported to bring the cost down to EUR 722 million. However the project’s feasibility studies are clearly faulty.  

An analysis by the Banja Luka-based Institute for Construction assumed that Tuzla 7 will have to start paying a carbon price only in 2034 and that it would only be EUR 7.1 per tonne, rising to EUR 12.12 per tonne in 2061. Considering the ETS price reached over 88 EUR per tonne in December 2021, this leads to a serious underestimate of the plant’s operating costs. 

The assessment assumes annual carbon costs of EUR 2.7 million in 2034, rising to EUR 31.4 million in 2061. Yet even at 20 EUR/tonne, the annual cost would be EUR 51.87 million.  

Moreover, the projected price at which coal would be sold by Elektroprivreda BIH’s mines to the Tuzla 7 plant is EUR 21.87/tonne. This is lower than 2013-2016 production price and is clearly not realistic.

Illegal State aid

Bosnia and Herzegovina, under the Energy Community Treaty, is obliged to follow EU legislation on State aid, but in 2018 and 2019 the Federation of BIH authorities approved an illegal loan guarantee for Tuzla 7. 

Such guarantees have to comply with certain conditions, such as not exceeding 80 per cent of the value of the loan. However the Tuzla 7 guarantee covers 100 per cent of the loan, plus additional unspecified costs. There are conditions in which covering 100 per cent of the loan could be allowed, but they are not met here. 

Prompted by a complaint by the Aarhus Resource Center, Sarajevo, and Bankwatch, in March 2019 the Energy Community Secretariat opened an infringement case against Bosnia and Herzegovina.  

EU Enlargement Commissioner Johannes Hahn also warned the country that its decision raised serious questions, “not only about Bosnia’s commitment to international treaties and European rules under the Energy Community Treaty but also about the choice of the energy technology as well as about a sound cost-benefit analysis in a responsible and transparent manner”. 

In November 2021 the guarantee was confirmed by the Energy Community Ministerial Council as being illegal, and in June 2022 the Bosnia and Herzegovina State Aid Council revoked its 2018 decision to approve the guarantee, thus remedying the breach and leaving the project’s future in doubt. 

However, the cancellation of the State Aid Council’s approval decision was successfully challenged in court by the Federal Ministry of Finance due to the impossibility of recovering unlawful aid that takes the form of a guarantee. Thus in January 2023 the approval decision was de facto reinstated despite the Energy Community Ministerial Council declaring it illegal. 

Denial reigns on over-employment issues

The Federation of BIH’s mines are also propped up by subsidies. They suffer from the lowest labour productivity in southeast Europe and have for years received subsidies for social welfare payment obligations towards the state. It is not allowed to provide State aid for operating coal mines. 

Closure is in any case inevitable in the medium term due to the need to phase out coal to tackle climate change and the increasingly poor economics of coal. For too long, politicians have made misleading promises about safeguarding 3500 workplaces in the mines by building Tuzla 7, instead of planning a just transition.

Non-compliance with EU pollution standards

After Tuzla 7’s initial environmental permit expired in November 2015, a new one was issued in July 2016. As it contained numerous weaknesses including a failure to include the ash dump in the project, NGO Ekotim filed a court case challenging the permit in September 2016. This was rejected in October 2019 on the outrageous ground that Ekotim is based in Sarajevo, while the project would be in Tuzla. An appeal to the high court overturned this verdict in late 2021. By this point, the permit had already expired and has not been renewed. 

In 2017 the EU updated its pollution control rules for large industrial plants through the so-called the LCP BREF. Tuzla 7 was not been designed in line with these standards. 

Opposition to Šićki Brod ash dump site

The planned site for the ash dump needed for Tuzla 7 at Šićki Brod was heavily opposed by the Lukavac municipality council and local communities. In April 2016 they presented a petition with 2100 signatures against the site to the Ministry of Environment and Tourism, and in 2019 protests ensured that the site was not included in the local spatial plans. No replacement site has been confirmed. 

'Hostages of coal'

An AlJazeera report on the situation of people affected by the coal infrastructure in Tuzla and Banovici.

Local language only.

Environmental legacies of existing operations

The existing units at Tuzla are not compliant with the Large Combustion Plants Directive or Industrial Emissions Directive. Due to Bosnia and Herzegovina’s commitments under the Energy Community Treaty, Units 3 and 4 should already have been closed. Unit 5 should also be closed in the next couple of years, and unit 6 must urgently comply with pollution control legislation, pending its closure date.

The ash dumps at Tuzla also brings hazards for the local population from dust blowing on windy days and water pollution, as well as soil pollution through food cultivated on some of the closed sections and sold on nearby markets. At the Divkovići dump, a pipe designed to divert dirty water to a treatment plant for cleaning is not used and polluted water enters local watercourses. These issues are not only a legacy of past practices, but a reflection of current ones, and halting these and remediating the area must be the focus of attention instead of building new sources of pollution. 

Latest news

Red flags over plans to swap coal for biomass and waste incineration in Tuzla

Blog entry | 8 September, 2022

The European Bank for Reconstruction and Development (EBRD) and Bosnia and Herzegovina’s energy utility Elektroprivreda BiH are signing today an agreement formalizing the Bank’s commitment to consider financial support for a particularly questionable energy project in Tuzla. But the public is barely aware of what this risky investment could bring to local communities.

Read more

Bosnia’s planned Tuzla 7 lignite plant on the rocks after state aid U-turn

Press release | 6 July, 2022

The future of the planned 450 MW Tuzla 7 lignite plant in Bosnia and Herzegovina is again in doubt after the country’s State Aid Council revoked its decision to approve a public guarantee for a EUR 614 million loan from China Eximbank last week, four years after the Council’s initial clearance.

Read more

Loan guarantee for Bosnia’s Tuzla 7 coal plant confirmed as illegal

Press release | 30 November, 2021

A public loan guarantee for the planned Tuzla 7 coal power plant in Bosnia and Herzegovina is illegal under the Energy Community Treaty, the Ministerial Council of the Energy Community has confirmed today (Tuesday). If realized, the project would aggravate Tuzla’s air pollution and prevent Bosnia and Herzegovina decarbonising its economy for decades to come.

Read more

  • 1
  • 2
  • 3
  • 4
  • ...
  • 27
Next Page »

Related publications

Risks for coal and electricity investments in the Western Balkans, Ukraine and Moldova due to state-aid rules

Study | 8 June, 2015 | Download PDF

By signing the Energy Community Treaty in 2005, countries in the Western Balkans, Ukraine and Moldova agreed that the European Union’s competition rules are to be applied also within their territory. A number of energy sector investments are being planned that may not so far have taken adequate account of State aid rules. This briefing therefore provides a summary to draw attention to relevant requirements of EU law and highlight the risks of failure to take them into account when planning investments. The account when planning investments.


Where will all that power go? New study assesses extravagant energy ambitions in the western Balkans

Bankwatch Mail | 14 May, 2015 |

Western Balkan countries have ambitious plans to increase their electricity generation over the next years. But what will happen if they all become a regional energy hub? Will there be a demand for all the available electricity?


Stranded assets in the Western Balkans – report on the long-term economic viability of new export capacities

Study | 19 March, 2015 | Download PDF

Country chapters available for Albania, Bosnia and Herzegovina, Kosovo, Macedonia, Montenegro, Serbia. For other languages, see here. Analysing the estimated energy demand and production capacities in Western Balkan countries, this study shows that if countries realise their planned capacity expansions, the region will have a 56 per cent electricity surplus in 2024, led by Bosnia and Herzegovina and Serbia. Nearly all governments in the region aspire to become electricity exporters, but the study argues that if governments fail to take into account the regional perspective, they could end up with power plants becoming simply uneconomic to operate.


« Previous Page
  • 1
  • ...
  • 3
  • 4
  • 5
  • 6
Next Page »

Footer

CEE Bankwatch Network gratefully acknowledges EU funding support.

The content of this website is the sole responsibility of CEE Bankwatch Network and can under no circumstances be regarded as reflecting the position of the European Union.

Unless otherwise noted, the content on this website is licensed under a Creative Commons BY-SA 4.0 License

Your personal data collected on the website is governed by the present Privacy Policy.

Get in touch with us

  • Bluesky
  • Email
  • Facebook
  • Instagram
  • LinkedIn
  • RSS
  • YouTube