Bulgaria has two main pillars of the electricity producing sector – coal and nuclear. Coal provides roughly half of the electricity in the country and nuclear another 35 per cent. The rest is covered by renewables dominated by large hydro and followed by solar and wind generation.
The currently prepared energy strategy of Bulgaria is likely to continue the coal and nuclear obsessions, with slightly increased reliance on imported gas. By the end of 2015 nearly 1700 MW of old coal capacity should be phased-out.
After that, it is very possible that Bulgaria will make efforts to build a new block in the existing plants of Maritsa East Complex and even develop another project near the city of Lom, where both a new mine and a power plant are have been discussed.
The Bulgarian power market is dominated by state owned producers. Bulgarian Energy Holding (BEH) manages the most important companies in the energy sector, Kozloduy nuclear power plant (NPP), TPP Maritsa Iztok 2, the National Electric Company (NEK), Electric System Operator (ESO), Bulgargaz, Bulgartransgaz and Bulgartel.
Three types of energy generators can be identified:
- Large producers are either owned by BEH, or privately owned thermal power plants. Each of the power plants has a quota of energy which must be delivered to regulated market, at regulated price. Excesses of energy can be sold through bilateral contracts. This also applies for cogeneration power plants. By 2015, some 1,800 MW in TPPs (in Varna, Bobov Dol and Russe) should be shut down due to environmental reasons.
- Cold reserve: there are some, mostly privately owned power plants with environmental issues and old units. Price of cold reserve is also regulated, and paid by NEK. Currently, cold reserves stand at over 1000 MW, which can be considered as quite unnecessary.
- RES producers: currently installed output of RES plants stands at well over 1700 MW (mostly wind and photovoltaic).
However, burning coal in primitive stoves continues to be a heating practice in Bulgaria, deteriorating further the situation with air pollution in most urban areas.
Still the consumption of coal for domestic heating is only 0.5 per cent (2.5 per cent taking into account the production of briquettes and other non-TPP consumers). Thermal power plants consume 97.5 per cent of the mined and the imported coal (over 30 million tons a year).
The biggest mining activities are situated in the Maritsa East Mining and Energy Complex situated in South Central Bulgaria in the region of Stara Zagora. The mining complex itself is situated on 240 km2 and produces nearly 97 per cent of the lignite in the country.
More on coal in the Balkans

Sustainable district heating gives hope to the Romanian city of Motru, in a coal mining region
A new study shows that the city’s district heating can come from fully renewable sources.
Read more

Bosnia and Herzegovina illegally extends lifetimes of deadly coal plants
Yesterday the Federation of Bosnia and Herzegovina’s Parliament voted to extend the lifetime of the antiquated Tuzla 4 and Kakanj 5 coal units, in clear breach of the Energy Community Treaty. The move condemns the public to yet more lethal air pollution.
Read more

The heroic dust monitor
This year we are marking five years since Bankwatch engaged in air pollution work in the Balkans. Throughout these years, there was one constant in the work – the environmental dust monitor. It has become the hero of many communities and is known to every organisation in the region that works for cleaner air.
Read more