Gacko II, Bosnia and Herzegovina
State-owned utility Elektroprivreda Republike Srpske, together with China Machinery and Engineering Corporation (CMEC) and Emerging Markets Power Fund, plans to build a new 350 MW lignite power plant in Gacko, near the town’s existing plant, and in December 2017 a Memorandum of Understanding was signed to move the project forward.

Stay informed
We closely follow international public finance and bring critical updates from the ground.
Background
State-owned utility Elektroprivreda Republike Srpske, together with China Machinery and Engineering Corporation (CMEC) and Emerging Markets Power Fund, plans to build a new 350 MW lignite power plant in Gacko, near the town’s existing plant, and in December 2017 a Memorandum of Understanding was signed to move the project forward.
As is too often the case in southeast Europe, there has been no convincing analysis proving that this plant is needed or that it would be the best way to provide Bosnia-Herzegovina’s energy supply in the coming years.
In April 2018 an analysis by economist Damir Miljević showed that fatal flaws in the input data make it highly likely the plant will generate losses. Three out of the main data inputs for the official feasibility study – the price of coal, electricity sales price, and the price of CO2 – are unrealistic:
-
- A realistic price of coal is mentioned in the study as just over EUR 18 per tonne – yet the amount used in the calculation is much lower, around EUR 13.3 per tonne.
- The Study foresees export of all the electricity generated, at a price of EUR 50 per MWh, except in exceptional cases when 30% would be sold on the domestic market at EUR 19.90 per MWh. There no evidence that the electricity would find a market and that it could be sold at this price – which is higher than the real export price in recent years. Moreover, the scenario including 30% of electricity being sold domestically is not even examined in the calculation – if it was it would show that the plant is unprofitable.
- A CO2 price of EUR 5 per tonne is mentioned in the text, but not included in the feasibility calculation. Including even this very low CO2 price in the calculation would take the plant into the realm of unprofitability.
- A realistic price of coal is mentioned in the study as just over EUR 18 per tonne – yet the amount used in the calculation is much lower, around EUR 13.3 per tonne.
The analysis concludes that although the official feasibility study for Gacko II claims it would generate profit of around EUR 23 million per year, with more realistic input data, a loss of minimum EUR 1.15 million per year looks more likely.
Gacko II is one of no fewer than five new coal power plants being pushed forward in Bosnia-Herzegovina, in addition to the 300 MW Stanari plant which went online in 2016. It is clear that not all of the projects can go ahead but so far the authorities are backing all of them, irrespective of the costs. However, as of January 2022, the project does not appear to have moved forward significantly and seems unlikely to go ahead.
Latest news
Narrow road ahead: the energy crisis in Kosovo in the context of Russia’s invasion of Ukraine
Blog entry | 24 June, 2022Kosovo, almost entirely reliant on coal for its energy, has nevertheless been hard-hit by the ongoing energy crisis. What steps should the country take to address this, and at the same time end its reliance on fossil fuels?
Read moreWestern Balkan coal pollution still massive, illegal and deadly – new report
Press release | 21 June, 2022In 2021, Western Balkan coal plants flagrantly breached air pollution legislation under the Energy Community Treaty for the fourth year in a row, emitting five times as much sulphur dioxide and 1.8 times as much dust as allowed, according to a report released today by CEE Bankwatch Network.
Read moreRomania’s decision to phase out coal by 2030: how will it serve a just and green energy transition?
Blog entry | 17 June, 2022Romania finally has its first concrete proposal to phase out coal by 2030. However, to ensure a successful transition, the end of coal needs to be linked with plans to increase renewable energy and a commitment to stay away from gas.
Read moreRelated publications
Chronic coal pollution
Study | 28 February, 2019 | Download PDFIn the Western Balkans there are 16 outdated coal power plants that threaten public health by producing enormous amounts of air pollution, impacting people in the region, the EU and beyond. Every year they cause 3,000 premature deaths, 8,000 cases of b
Heroes of Just Transition
Study | 7 December, 2018 | Download PDFOn Dec. 5, during the side event ‘Local communities build a post-coal future’ at the COP24 in Katowice, Bankwatch launched its publication ‘Heroes of Just Transition’, featuring seven stories from coal communities around central and eastern Europe, the
Results of air pollution independent monitoring call for immediate action in Balkan countries
Briefing | 26 November, 2018 | Download PDFIndependent particulate matter monitoring implemented by CEE Bankwatch Network and partner organisations from the region between October 2016 and April 2017 in six different coal-heavy locations in the Balkans just scratched the surface of the impact t