Kamengrad lignite power plant, Bosnia-Herzegovina
An idea to build a power plant at the open-cast Kamengrad coal mine near Sanski Most in the Federation of Bosnia and Herzegovina has been around for years, but in November 2017 it took a step forward with the signing of a Memorandum of Understanding between Energy China International and the construction supplier Lager d.o.o. for a 2 x 215 MW plant.
Stay informed
We closely follow international public finance and bring critical updates from the ground.
Background
An idea to build a power plant at the open-cast Kamengrad coal mine near Sanski Most in the Federation of Bosnia and Herzegovina has been around for years, but in November 2017 it took a step forward with the signing of a Memorandum of Understanding between Energy China International and the construction supplier Lager d.o.o. for a 2 x 215 MW plant.
Few details are available about the plant, and it has no environmental permit and no financing. As with other plants across the region, unrealistic employment promises have already been made. In December 2017 head of the Sanski Most District Faris Hasanbegović stated that it would provide 1000 workplaces.
This does not appear to have convinced local people, however. As it would be a new power plant, it has attracted much more opposition locally than most other planned plants in the country. Sanski Most is located on the beautiful river Sana and prides itself on having no fewer than nine rivers in the district altogether. As a scenic and green area many of its residents feel that the power plant will spoil its potential for agriculture and tourism rather than bringing prosperity.
At a public debate on the adoption of the Una-Sana Canton spatial plan in August 2018, Sanski Most residents and the local council demanded the removal of the power plant project from the plan. This was carried out, although the plan was never adopted. In November 2019, another presentation of the Kamengrad coal power plant project appeared on the agenda of the Sanski Most Municipal Council. However, the meeting was cancelled after public pressure.
Another issue is that the concession for the mine was awarded to Lager d.o.o. after a bankruptcy procedure was carried out for the previous operator, RMU Kamengrad, but in 2017 the bankruptcy decision was declared illegal by the Constitutional Court of Bosnia and Herzegovina and returned to the Una-Sana Canton court.
As of early 2024, the plant is very unlikely to go ahead but has not been officially cancelled.
Latest news
Western Balkans: Civil society groups call on European Commission to strengthen support for just transition
Press release | 4 October, 2024A group of civil society organisations, including CEE Bankwatch Network, are calling on the European Commission and other actors to step up support for a just transition in coal-dependent communities in the Western Balkans.
Read moreWestern Balkans: coal pollution increases due to government failures – new report
Press release | 17 September, 2024In 2023, Western Balkan governments’ dereliction of their law enforcement duties again allowed an increase in sulphur dioxide (SO2) pollution from the region’s antiquated coal power plants, according to the sixth edition of Bankwatch’s Comply or Close report, published today (1). Dust and nitrogen oxides (NOx) pollution from coal plants also continued to exceed legal limits.
Read moreEnvironmental NGOs demand halt to KfW controversial biomass investments in Serbia
Press release | 29 July, 202441 environmental organisations from the Western Balkans, Germany, and across Europe have called on German state-owned development bank KfW to stop financing wood biomass energy in Serbia in order to avoid forest degradation risks and locking Serbia into further dependency on high-carbon energy sources.[1]
Read moreRelated publications
Complaint regarding Sostanj TES6: CCS, public procurement, economic vialbility
Official document | 9 January, 2012 | Download PDFThe complaint, filed with the European Investment Bank by Environmental Law Service (CZ) and Focus Association for Sustainable Development (SI), outlines controversies in relation to the Sostanj lignite thermal power plant with regards to the following aspects: insubstantial allegation that the project is „carbon capture ready“ and that the assessment submitted by the operator fulfils the criteria set up by the relevant EU Directive, failure to comply with the relevant EU directive for public procurements, questionable economic viability of the project.
A critical examination of the investment proposals for Unit 6 of the Sostanj power plant
Study | 28 November, 2011 | Download PDFFour investment plans have been produced for the Sostanj lignite fired power plant in Slovenia with many differences in calculations and outcomes. This review of the latest investment plan illustrates a number of shortcomings including both methodological mistakes and unsubstantiated claims.
Sostanj power plant in Slovenia: Against EU laws and policies
Briefing | 21 November, 2011 | Download PDFThe project is a plan to construct a sixth unit at the Sostanj lignite-fired power plant in Slovenia. It has received significant backing from European public banks adding up to more than 50% of the overall costs of the investment. Doubts about the economic viability of the project, alleged irregularities in the tendering procedure and its climate impact caused strong opposition to the project within Slovenia. A recent study conducted by an independent consultant as well as two complaints submitted to the European Commission by NGOs bring new arguments against TES 6.