• Skip to primary navigation
  • Skip to main content
  • Skip to footer

Bankwatch

  • About us
    • Our vision
    • Who we are
    • 30 years of Bankwatch
    • Donors & finances
    • Get involved
  • What we do
    • Campaign areas
      • Beyond fossil fuels
      • Rights, democracy and development
      • Finance and biodiversity
      • Funding the energy transformation
      • Cities for People
    • Institutions we monitor
      • European Bank for Reconstruction and Development
      • European Investment Bank
      • Asian Infrastructure Investment Bank
      • Asian Development Bank (ADB)
      • EU funds
    • Our projects
    • Success stories
  • Publications
  • News
    • Blog posts
    • Press releases
    • Stories
    • Podcast
    • Us in the media
    • Videos

Home > Publications > Renewable energy permitting in Bosnia and Herzegovina: how to optimise the process while safeguarding the environment and public participation

Renewable energy permitting in Bosnia and Herzegovina: how to optimise the process while safeguarding the environment and public participation

Renewable energy permitting in Bosnia and Herzegovina: how to optimise the process while safeguarding the environment and public participation

Alan Ajan via Adobe Stock

Briefing    |    25 July 2023

Download

Bosnia and Herzegovina (BiH) undoubtedly has significant potential to develop environmentally acceptable forms of renewable energy. Likewise, considering that its coal plants are rapidly ageing, there is a pressing need for investments in wind and solar projects in particular. To ensure that social consensus is reached on the locations, types and construction methods of renewable energy installations, robust implementation of the Aarhus Convention, which guarantees public access to environmental information and public participation in decision-making on environmental matters regarding individual projects, plans, programmes and legislation, is necessary.

This analysis begins with an overview of the permits required for building renewable energy facilities in the two entities of Bosnia and Herzegovina: the Federation of Bosnia and Herzegovina (FBiH) and Republika Srpska (RS). For each entity, we summarise the permitting process for larger facilities, particularly hydropower plants and wind plants, as well as the steps involved in permitting small solar installations. Finally, we provide recommendations to improve the processes for all projects in each entity. These recommendations are intended not only to eliminate needless and time-consuming practices, but also to advance the transposition and implementation of EU legislation on environmental protection and public participation.

Download

Theme: Renewable energy

Location: Bosnia and Herzegovina

Tags: Bosnia and Herzegovina | hydropower | renewable energy | renewables

Never miss an update

We expose the risks of international public finance and bring critical updates from the ground. We believe that the billions of public money should work for people and the environment.

More about our work

More about us

STAY INFORMED





Footer

CEE Bankwatch Network gratefully acknowledges EU funding support.

The content of this website is the sole responsibility of CEE Bankwatch Network and can under no circumstances be regarded as reflecting the position of the European Union.

Unless otherwise noted, the content on this website is licensed under a Creative Commons BY-SA 4.0 License

Your personal data collected on the website is governed by the present Privacy Policy.

Get in touch with us

  • Bluesky
  • Email
  • Facebook
  • Instagram
  • LinkedIn
  • RSS
  • YouTube