Gacko II, Bosnia and Herzegovina
The Republika Srpska government plans to build a new 350 MW lignite power plant in Gacko, near the town’s existing plant. After years of stagnation, in August 2022 it was reported that the Czech company Witkowitz was considering investing in the project.
Stay informed
We closely follow international public finance and bring critical updates from the ground.
Background
In December 2017, a Memorandum of Understanding was signed between state-owned utility Elektroprivreda Republike Srpske, the China Machinery and Engineering Corporation (CMEC) and Emerging Markets Power Fund, to build a new 350 MW lignite power plant in Gacko, near the town’s existing plant. After years of stagnation, in August 2022 it was reported that the Czech company Witkowitz was considering investing in the project. However, it is still unclear where financing would come from.
As is too often the case in southeast Europe, there has been no convincing analysis proving that this plant is needed or that it would be the best way to provide Bosnia-Herzegovina’s energy supply in the coming years.
In April 2018 an analysis by economist Damir Miljević showed that fatal flaws in the input data make it highly likely the plant will generate losses. Three out of the main data inputs for the official feasibility study – the price of coal, electricity sales price, and the price of CO2 – are unrealistic:
- A realistic price of coal is mentioned in the study as just over EUR 18 per tonne – yet the amount used in the calculation is much lower, around EUR 13.3 per tonne.
- The Study foresees export of all the electricity generated, at a price of EUR 50 per MWh, except in exceptional cases when 30% would be sold on the domestic market at EUR 19.90 per MWh. There no evidence that the electricity would find a market in the long term and that it could be sold at this price. Moreover, the scenario including 30% of electricity being sold domestically is not even examined in the calculation – if it was it would show that the plant is unprofitable.
- A CO2 price of EUR 5 per tonne is mentioned in the text, but not included in the feasibility calculation. Including even this very low CO2 price in the calculation would take the plant into the realm of unprofitability.
The analysis concludes that although the official feasibility study for Gacko II claims it would generate profit of around EUR 23 million per year, with more realistic input data, a loss of minimum EUR 1.15 million per year looks more likely.
By now the study is also very much out of date, and the impacts of the EU’s planned Carbon Border Adjustment Mechanism would need to be taken into account for any electricity planned for export.
A March 2023 study by IEEFA found that Gacko II would become a stranded asset under several scenarios, even with generous assumptions that favour lignite generation, and that financing for the project is uncertain. The study also found that investing in onshore wind and utility-scale solar PV would offer safer and improving returns, quicker construction and cleaner power, as well as better access to financing.
In October 2023, an environmental impact assessment process began for the project, and a public consultation on the study was held in 2025. As of January 2026, it does not seem to have been approved.
Latest news
Power to the people: How distribution grid improvements can speed up energy transformation in the Western Balkans
Blog entry | 23 April, 2026The key to long-term sustainability of the energy transition is a decentralised electricity generation system where everyone can be an active participant and share the benefits. For this to happen, the distribution grids that connect end consumers to the system need to be bidirectional, stable, modern and smart.
Read moreFear and fossil fuels in Romania
Blog entry | 11 February, 2026A draft law supported by thirty members of the Parliament, aims to roll back Romania’s coal phase out and, at the same time, delivers a masterclass in manipulation.
Read moreJoint NGO statement: New EU budget must ensure dedicated funds for environmental protection and just transition in the Western Balkans
Press release | 28 May, 202568 civil society organisations have today issued a joint statement calling on the EU to ensure dedicated funds for environmental protection and just transition of coal-dependent regions in the Western Balkans in the post-2027 EU budget.
Read moreRelated publications
Croatian coal power plans advancing despite legal violations and economic unfeasibility
Bankwatch Mail | 8 October, 2012 |It has been a busy time of late for the planned EUR 800 million, 500 MW Plomin C coal power plant. The Croatian government is pressing ahead with the project under the assumption that it will – along with the equally controversial EBRD-financed Ombla hydropower plant – save Croatia’s ailing economy. Yet it is far from certain who will actually participate in the project, let alone finance it.
Open letter to Serbian president: Protect our property in the Vreoci cemetery
Advocacy letter | 4 October, 2012 | Download PDFThe letter is asking the Serbian government to protect Vreoci community property in the Vreoci cemetery and especially an orthodox chapel that is property of Vreoci citizens.
OLAF decision to investigate corruption at TES 6
Official document | 19 July, 2012 | Download PDFThe European Anti-Fraud Office (OLAF) decided to start an official investigation into the case of the Sostanj lignite power plant in Slovenia due to serious concerns about corruption and conflicts of interests in the granting of the contract to the company Alstom. (Information on OLAF staff has been blackened on request by the Office.)