Gacko II, Bosnia and Herzegovina
The Republika Srpske government plans to build a new 350 MW lignite power plant in Gacko, near the town’s existing plant. After years of stagnation, in August 2022 it was reported that the Czech company Witkowitz was considering investing in the project.

Stay informed
We closely follow international public finance and bring critical updates from the ground.
Background
In December 2017, a Memorandum of Understanding was signed between state-owned utility Elektroprivreda Republike Srpske, the China Machinery and Engineering Corporation (CMEC) and Emerging Markets Power Fund, to build a new 350 MW lignite power plant in Gacko, near the town’s existing plant. After years of stagnation, in August 2022 it was reported that the Czech company Witkowitz was considering investing in the project. However, it is still unclear where financing would come from.
As is too often the case in southeast Europe, there has been no convincing analysis proving that this plant is needed or that it would be the best way to provide Bosnia-Herzegovina’s energy supply in the coming years.
In April 2018 an analysis by economist Damir Miljević showed that fatal flaws in the input data make it highly likely the plant will generate losses. Three out of the main data inputs for the official feasibility study – the price of coal, electricity sales price, and the price of CO2 – are unrealistic:
- A realistic price of coal is mentioned in the study as just over EUR 18 per tonne – yet the amount used in the calculation is much lower, around EUR 13.3 per tonne.
- The Study foresees export of all the electricity generated, at a price of EUR 50 per MWh, except in exceptional cases when 30% would be sold on the domestic market at EUR 19.90 per MWh. There no evidence that the electricity would find a market in the long term and that it could be sold at this price. Moreover, the scenario including 30% of electricity being sold domestically is not even examined in the calculation – if it was it would show that the plant is unprofitable.
- A CO2 price of EUR 5 per tonne is mentioned in the text, but not included in the feasibility calculation. Including even this very low CO2 price in the calculation would take the plant into the realm of unprofitability.
The analysis concludes that although the official feasibility study for Gacko II claims it would generate profit of around EUR 23 million per year, with more realistic input data, a loss of minimum EUR 1.15 million per year looks more likely.
By now the study is also very much out of date, and the impacts of the EU’s planned Carbon Border Adjustment Mechanism would need to be taken into account for any electricity planned for export.
Latest news
Croatia, Italy and Colombia linked by harm from coal industry
Blog entry | 22 February, 2016Last Tuesday activists from Croatia, Italy and Colombia formed a human chain in front of the Plomin coal power plant to highlight that the real price of coal is human lives – at both ends of the chain of production.
Read moreGuest post: New report shows that New Kosovo Power Plant would worsen poverty and cripple a fragile economy
Blog entry | 12 January, 2016No-one will ‘freeze to death’ if the planned lignite-fired power plant in Kosovo does not receive support from multilateral development banks, but if it does, low-income households may well end up choosing between electricity and food. How can an institution, whose very mission is to end poverty, justify this project?
Read moreSerbia: EBRD Admitted Mistakes with EPS
Bankwatch in the media | 15 December, 2015CEKOR had a meeting with the EBRD Director for Serbia, Daniel Berg, at which the Report on EBRD Complaint Mechanism was considered. In accordance with the undertaken contractual obligations, the EPS should enhance its procedures not only for the case of Vreoci, to which the complaint referred, but also at all locations where it performs business operations.
Read moreRelated publications
The Western Balkan power sector: between crisis and transition
Report | 5 December, 2022 | Download PDFAs energy transition in the Western Balkans slowly proceeds, energy crisis has hit the region on four fronts: electricity prices, technical problems at coal plants, lack of water for hydropower, and skyrocketing biomass prices. This crisis is both a se
The EBRD must stay away from the unsustainable conversion of Tuzla’s coal plant and prioritise renewables in the district heating sector
Briefing | 9 November, 2022 | Download PDFThis briefing offers an overview of the European Bank for Reconstruction and Development’s (EBRD) ongoing assessment of whether to grant a EUR 50 million loan in order to replace unit 3 of the Tuzla coal plant with a waste and biomass incineration syst
Air pollution and associated health impacts in Novaci, North Macedonia
Report | 6 April, 2022 | Download PDFFor the last forty years, the municipality of Novaci has been home to North Macedonia’s REK Bitola complex, which consists of a 675 MW lignite power plant, open-cast mines and ash disposal sites. Its inhabitants have been breathing pollution emitted at