• Skip to primary navigation
  • Skip to main content
  • Skip to footer

Bankwatch

  • About us
    • Our vision
    • Who we are
    • 30 years of Bankwatch
    • Donors & finances
    • Get involved
  • What we do
    • Campaign areas
      • Beyond fossil fuels
      • Rights, democracy and development
      • Finance and biodiversity
      • Funding the energy transformation
      • Cities for People
    • Institutions we monitor
      • European Bank for Reconstruction and Development
      • European Investment Bank
      • Asian Infrastructure Investment Bank
      • Asian Development Bank (ADB)
      • EU funds
    • Our projects
    • Success stories
  • Publications
  • News
    • Blog posts
    • Press releases
    • Stories
    • Podcast
    • Us in the media
    • Videos

Home > Projects > Kamengrad lignite power plant, Bosnia-Herzegovina

Kamengrad lignite power plant, Bosnia-Herzegovina

An idea to build a power plant at the open-cast Kamengrad coal mine near Sanski Most in the Federation of Bosnia and Herzegovina has been around for years, but in November 2017 it took a step forward with the signing of a Memorandum of Understanding between Energy China International and the construction supplier Lager d.o.o. for a 2 x 215 MW plant.

kamengrad lignite power plant, Bosnia-Herzegovina

Stay informed

We closely follow international public finance and bring critical updates from the ground.





Background

An idea to build a power plant at the open-cast Kamengrad coal mine near Sanski Most in the Federation of Bosnia and Herzegovina has been around for years, but in November 2017 it took a step forward with the signing of a Memorandum of Understanding between Energy China International and the construction supplier Lager d.o.o. for a 2 x 215 MW plant. 

Few details are available about the plant, and it has no environmental permit and no financing. As with other plants across the region, unrealistic employment promises have already been made. In December 2017 head of the Sanski Most District Faris Hasanbegović stated that it would provide 1000 workplaces.  

This does not appear to have convinced local people, however. As it would be a new power plant, it has attracted much more opposition locally than most other planned plants in the country. Sanski Most is located on the beautiful river Sana and prides itself on having no fewer than nine rivers in the district altogether. As a scenic and green area many of its residents feel that the power plant will spoil its potential for agriculture and tourism rather than bringing prosperity. 

At a public debate on the adoption of the Una-Sana Canton spatial plan in August 2018, Sanski Most residents and the local council demanded the removal of the power plant project from the plan. This was carried out, although the plan was never adopted. In November 2019, another presentation of the Kamengrad coal power plant project appeared on the agenda of the Sanski Most Municipal Council. However, the meeting was cancelled after public pressure. 

Another issue is that the concession for the mine was awarded to Lager d.o.o. after a bankruptcy procedure was carried out for the previous operator, RMU Kamengrad, but in 2017 the bankruptcy decision was declared illegal by the Constitutional Court of Bosnia and Herzegovina and returned to the Una-Sana Canton court.  

As of early 2025, the plant is very unlikely to go ahead but has not been officially cancelled. 

Latest news

Izvješće: Termoelektrane na ugljen na zapadnom Balkanu odnose tisuće života

Bankwatch in the media | 8 September, 2021

TERMOELEKTRANE na ugljen na području zapadnog Balkana nastavljaju ozbiljno ugrožavati okoliš u zemljama te regije, ali i Europske unije …

Read more

Η ατμοσφαιρική ρύπανση από τους σταθμούς παραγωγής στα δυτικά Βαλκάνια, οι κίνδυνοι και η σύνδεση με θανάτους

Bankwatch in the media | 8 September, 2021

Πολίτης στη Μιτρόβιτσα της Σερβίας καλύπτει με μαντήλι το πρόσωπο εξαιτίας της αποπνικτικής ατμόσφαιρας, λόγω ρύπανσης/Φωτογραφία …

Read more

Uznemirujuće otkriće: Na Zapadnom Balkanu zbog zagađenja zraka u tri godine umrlo 19.000 ljudi

Bankwatch in the media | 8 September, 2021

General Electric i Siemens odustali su od od termoelektrane na ugljen u Tuzli, ali Kinezi kažu da će sve napraviti sami

Read more

« Previous Page
  • 1
  • ...
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • ...
  • 200
Next Page »

Related publications

Beyond the scoreboard: Energy sector transformation under the Reform and Growth Facility for the Western Balkans

Report | 5 December, 2025 | Download PDF

This analysis offers an overview of the energy-related reforms from Albania, Kosovo, Montenegro, North Macedonia and Serbia and then evaluates the countries’ progress.


A perfect storm: The Western Balkans power sector in the time of CBAM

Report | 29 October, 2025 | Download PDF

Starting with the EU’s Carbon Border Adjustment Mechanism (CBAM) full implementation in January 2026, most electricity generation companies in the Western Balkans will be heavily affected.


Comply or Close 2025: Seven years of deadly legal breaches by Western Balkan coal plants

Report | 17 June, 2025 | Download PDF

The end of 2024 marked seven years since the deadline passed for power plants in the Western Balkans to meet new air pollution standards.


  • 1
  • 2
  • 3
  • 4
  • ...
  • 51
Next Page »

Footer

CEE Bankwatch Network gratefully acknowledges EU funding support.

The content of this website is the sole responsibility of CEE Bankwatch Network and can under no circumstances be regarded as reflecting the position of the European Union.

Unless otherwise noted, the content on this website is licensed under a Creative Commons BY-SA 4.0 License

Your personal data collected on the website is governed by the present Privacy Policy.

Get in touch with us

  • Bluesky
  • Email
  • Facebook
  • Instagram
  • LinkedIn
  • RSS
  • YouTube