• Skip to primary navigation
  • Skip to main content
  • Skip to footer

Bankwatch

  • About us
    • Our vision
    • Who we are
    • 30 years of Bankwatch
    • Donors & finances
    • Get involved
  • What we do
    • Campaign areas
      • Beyond fossil fuels
      • Rights, democracy and development
      • Finance and biodiversity
      • Funding the energy transformation
      • Cities for People
    • Institutions we monitor
      • European Bank for Reconstruction and Development
      • European Investment Bank
      • Asian Infrastructure Investment Bank
      • Asian Development Bank (ADB)
      • EU funds
    • Our projects
    • Success stories
  • Publications
  • News
    • Blog posts
    • Press releases
    • Stories
    • Podcast
    • Us in the media
    • Videos

Home > Projects > Kostolac B power plant (B1, B2), Serbia

Kostolac B power plant (B1, B2), Serbia

The Kostolac B power plant, consisting of 2 units of 350 MW each, first started operating in 1987. In 2023, the plant delivered 4445 GWh of electricity to the grid, nearly 20 per cent of the country’s coal-based generation.


Photo: Kostolac B power plant, Serbia, Dec 2021.

Stay informed

We closely follow international public finance and bring critical updates from the ground.





Background

Serbia’s energy utility EPS secured financing for a complete overhaul of Kostolac B1 and B2 in December 2011. A USD 293 million loan was taken by the Government of Serbia on behalf of EPS from China Exim Bank to equip the two units with flue gas desulphurisation (de-SOx) technology and bring the plant’s SO2 emissions in line with the Large Combustion Plant Directive. This should have been done by the time the Directive entered into force in January 2018. The company contracted for the works was the China Machinery and Engineering Corporation (CMEC), the same company which has built a new unit at Kostolac B. 

The works were finalised in July 2017, according to the Government. However, EPS’ 2018 Environmental Report shows that the application for a construction permit for the de-SOx installation was submitted only in November 2018 – more than a year after the opening ceremony for the facility. The permit was actually rejected twice – once in December 2018 and once in January 2019 – although the grounds on which rejections were issued by the Serbian authority are unknown. 

The only explanation we received at the time from EPS and the Serbian Ministry of Energy and Mining was that the gypsum landfill was not ready for the de-SOx to start operation. 

In December 2019, EPS launched a public consultation for an ‘updated’ Environmental Impact Assessment (EIA) report for the desulphurisation unit at Kostolac B, and public consultations were held in January 2020. The decision approving this new EIA for the already built de-SOx facility was made in August 2020. 

In April 2021, the Ministry of Mining and Energy announced that in fact the facility has been operating in testing mode since October 2020 but annual emissions in 2020 were much higher than those in the previous year. Kostolac B released 95,097 tonnes of SO2 in 2020, which was enough to breach the national – not plant level – 2020 ceiling for this pollutant by 1.74 times.

In 2021, the plant finally started to decrease its sulphur dioxide emissions. It emitted 26,015 tonnes of SO2 – a significant reduction compared to 95,097 tonnes in 2020 – but still 1.6 times as much as allowed. However, in 2022 and 2023, its SO2 emissions increased, emitting nearly 5.8 times as much as allowed in 2023.

Since the period between the start of testing and requesting the operating permit for the desulphurisation equipment could not legally be longer than a year, EPS requested an operating permit in October 2021. The Ministry neither approved nor rejected this, so EPS made several more requests before finally obtaining the operating permit in January 2023. 

Latest news

The dirty French-Slovenian connection

Press release | 23 February, 2012

Slovenian state anti-corruption body claims ALSTOM could have benefited from corrupt acts to get deal to build new lignite plant at Sostanj.

Read more

Poročilo CE Delft znižuje notranjo stopnjo donosa Teš 6

Bankwatch in the media | 28 November, 2011

Neutemeljene predpostavke omogočajo večanje tveganj in če se ta uresničijo, lahko stopnja pade celo na 5,12 odstotka, je danes ob predstavitvi metodoloških napak investicijskega programa Teša 6 dejal Geert Warringa iz CE Delft.

Read more

Independent analysis questions economic viability of TES 6

Press release | 28 November, 2011

Ljubljana – An independent analysis commissioned by Bankwatch and Focus published today reveals a number of unsubstantiated claims and methodological mistakes in the investment plan for the TEŠ 6 lignite plant in Slovenia. Correct calculations show that the internal rate of return is in reality lower than estimated by the project promoter, state-owned TEŠ. Had the rate of return been calculated properly, the project would not have qualified for the EIB loan of 440 million euros it is set to receive.

Read more

« Previous Page
  • 1
  • ...
  • 193
  • 194
  • 195
  • 196
  • 197
  • 198
  • 199
  • 200
Next Page »

Related publications

Beyond the scoreboard: Energy sector transformation under the Reform and Growth Facility for the Western Balkans

Report | 5 December, 2025 | Download PDF

This analysis offers an overview of the energy-related reforms from Albania, Kosovo, Montenegro, North Macedonia and Serbia and then evaluates the countries’ progress.


A perfect storm: The Western Balkans power sector in the time of CBAM

Report | 29 October, 2025 | Download PDF

Starting with the EU’s Carbon Border Adjustment Mechanism (CBAM) full implementation in January 2026, most electricity generation companies in the Western Balkans will be heavily affected.


Comply or Close 2025: Seven years of deadly legal breaches by Western Balkan coal plants

Report | 17 June, 2025 | Download PDF

The end of 2024 marked seven years since the deadline passed for power plants in the Western Balkans to meet new air pollution standards.


  • 1
  • 2
  • 3
  • 4
  • ...
  • 51
Next Page »

Footer

CEE Bankwatch Network gratefully acknowledges EU funding support.

The content of this website is the sole responsibility of CEE Bankwatch Network and can under no circumstances be regarded as reflecting the position of the European Union.

Unless otherwise noted, the content on this website is licensed under a Creative Commons BY-SA 4.0 License

Your personal data collected on the website is governed by the present Privacy Policy.

Get in touch with us

  • Bluesky
  • Email
  • Facebook
  • Instagram
  • LinkedIn
  • RSS
  • YouTube