EFT’s 300 MW Stanari power plant, constructed by China’s Dongfang, and financed by the China Development Bank, is located near Doboj in Bosnia-Herzegovina, in the Republika Srpska part of the country.
Stanari power plant under construction in early 2014
Stay informed
We closely follow international public finance and bring critical updates from the ground.
Background
Originally Stanari was planned to be a 420 MW plant but this was considered to be on the edge of economic viability and the capacity was reduced to 300 MW.
The plant officially started commercial operations in September 2016, but was already out of date in terms of environmental standards. Its environmental permit stipulates compliance only with the older EU Large Combustion Plants (LCP) Directive, not with the newer Industrial Emissions Directive.
During the project’s development a number of problems were raised, including the following:
No environmental impact assessment for the changed project
The environmental impact assessment process was carried out only for the original, larger version of the project and the Republika Srpska authorities did not require a new process for the new, smaller plant.
While it may appear that a smaller plant has a smaller environmental impact and therefore does not need a new study, several other changes were involved that could alter the situation:
- The project was originally planned to have a net thermal efficiency of 43 percent but the new version is down to 34.1 per cent.
- It was changed from supercritical pulverised lignite technology to subcritical circulating fluidised bed combustion.
- The cooling technology has also been changed from a wet to a dry cooling system. This is one of the main reasons for the loss of thermal efficiency.
Al Jazeera’s Dragan Stanimirović reports, the Stanari project is causing mixed reactions from local residents and concern to environmental groups about health impacts and CO2 emissions.
(Not available in English)
Environmental permit not compliant with pollution standards
Since 2006, Bosnia-Herzegovina has been a party to the Energy Community Treaty, which requires all members to abide by certain EU legislation in the energy sector.
This meant that while developing the Stanari project, Bosnia-Herzegovina was obliged to adhere to the EU Large Combustion Plants Directive, which regulates emissions limit values from power plants. Originally, the Republika Srpska authorities did not include the emissions limit values from the LCP Directive in Stanari’s environmental permit, but rather much laxer standards from domestic legislation with emissions 2-3 times higher.
In January 2014, an official complaint was submitted to the Energy Community Secretariat by the Center for Environment from Banja Luka and in July 2015 it was announced that the Stanari environmental permit would be updated following changes in the Republika Srpska legislation. Nevertheless, this still puts Stanari several years behind EU legislation.
Latest news
Ecologists warn that Residents around Stanari coal-fired Power Plant are regularly affected by Pollution from different Directions
Bankwatch in the media | 18 September, 2019The Stanari coal-fired power plant, which started operating in September 2016, its ash disposal site, and the already-existing open-cast lignite mine have formed a curve around the north and east of the village.
Read moreAlarmantna zagađenost vazduha štetnom prašinom u Stanarima
Bankwatch in the media | 17 September, 2019Alarmantna zagađenost vazduha štetnom prašinom u Stanarima
Read moreStanovnici Stanara se guše: Enormna zagađenost zraka
Bankwatch in the media | 17 September, 2019U Stanarima postoje alarmantne satne vrijednosti štetnih čestica prašine u zraku – pokazali su nezavisna mjerenja kvaliteta zraka, navodi se u izvještaju organizacije CEE Bankwatch koji je urađen u saradnji sa Centrom za životnu sredinu
Read moreRelated publications
The great coal jobs fraud – unrealistic employment claims in southeast Europe
Study | 14 November, 2016 | Download PDFThis report reveals how and why promises for new jobs in south-east Europe’s coal sector are exaggerated. Hardly any coal operations across the region are economically viable, and as a result many coal workers, especially in the mines, are set to lose their jobs, even if the plans for countless new power plants materialise. Governments, coal workers and their wider communities need to work together towards a just transition.
Balkan energy projects with Chinese involvement – state of play
Briefing | 31 July, 2016 | Download PDFBosnia and Herzegovina, Serbia, Montenegro and Romania all plan new lignite power plants during the next few years. In contrast, most EU countries are giving up building new coal plants and seven EU states are already coal-free. Since the European Investment Bank, the European Bank for Reconstruction and Development and the World Bank have virtually halted lending for new coal power plants, most of them are due to be financed by Chinese state banks – ExIm Bank and the China Development Bank.
Balkan energy projects with Chinese involvement – state of play, May 2016
Briefing | 5 May, 2016 | Download PDFSee a more recent version of this briefing >>