• Skip to primary navigation
  • Skip to main content
  • Skip to footer

Bankwatch

  • About us
    • Our vision
    • Who we are
    • 30 years of Bankwatch
    • Donors & finances
    • Get involved
  • What we do
    • Campaign areas
      • Beyond fossil fuels
      • Rights, democracy and development
      • Finance and biodiversity
      • Funding the energy transformation
      • Cities for People
    • Institutions we monitor
      • European Bank for Reconstruction and Development
      • European Investment Bank
      • Asian Infrastructure Investment Bank
      • Asian Development Bank (ADB)
      • EU funds
    • Our projects
    • Success stories
  • Publications
  • News
    • Blog posts
    • Press releases
    • Stories
    • Podcast
    • Us in the media
    • Videos
  • Русский

Home > Projects > Hydropower development in Georgia

Hydropower development in Georgia

Georgia plans to build a huge number of dams. Yet with 85 percent of electricity needs satisfied and exports not being taxed, these plans will rather benefit private investors than offering sustainable development for Georgia.

Large trees in front of an imposing mountain range and blue sky.

Stay informed

We closely follow international public finance and bring critical updates from the ground.





Key facts

installed capacity:
3500 MW
(= 25% of available capacity – Source)

annual output:
appr. 8.5 TWh

share of domestic electricity needs:
85 percent (Source)

potential capacity:
estimated with 80 TWh (27 TWh economically viable)

Key issues

  • large dams will have adverse impacts on local communities’ livelihoods – more >>
  • a cascade of projects will reshape the pristine mountain area of Upper Svaneti – more >>
  • land- and mud slides have already resulted in casualties, yet geological risks are not properly assessed  – more >>
  • legal framework in Georgia offers limited protection for people affected by expropriation and resettlement – more >>

Background

Blessed with staggering mountains, Georgia has a largely unexploited hydropower potential on which private investors, the Georgian government and international lenders have set their sight.

Experience and ongoing monitoring shows that while some hydropower projects would only bring marginal, if any, benefits for locals, the risks associated with them are largely being underestimated or ignored.

Large dams versus local communities

Khudoni

Click to read: Georgian Ombudsman rejected by Khudoni dam promoters

By far the most controversial hydropower project in Georgia is the Khudoni dam. It will interfere with a rich cultural heritage and 2000 people will have to be forcefully resettled.

At the same time the opaque ownership of the project company (registered in a tax haven) and its contractual obligations make the purported benefits of the 702 MW project doubtful.

Nenskra

A river is hardly visible in between lush greenery, running down a cravesse between two hills.

Not far from the site for Khudoni, another controversial large dam project, the 280 MW Nenskra hydropower plant, is being planned. It is the most advanced of Georgia’s massive plans for hydropower installations in the Upper Svaneti region.

It will deprive the local community of ethnic Svans of lands and livelihoods, but potential negative impacts have not been properly assessed.

Svaneti is my homeland

Discover the hidden beauty of Georgia’s Caucasus mountains and meet the locals whose traditions make the region so unique.

A historical view on the Georgian energy sector, the effects on local communities and the role of international financial institutions.

A cascade of projects

An interactive map of planned hydro installations in the Upper Svaneti region shows how dense and without strategic planning these investments are being proposed.

Geological hazards in mountain areas

Also smaller projects like the Dariali (pdf) and the Shuakhevi (pdf) HPPs can pose substantial risks, even when no dams have to be built.

Apart from damaging the rivers’ biodiversity, the projects are being constructed without proper assessment of the geological conditions. Two fatal landslides in the Dariali Gorge revealed the irresponsible decision-making by the investors and the Georgian government.

Read more
Second fatal landslide in Georgian Dariali valley
Blog post | August 22, 2014

An aerial view of a truck driving through a valley full of grey mud.

Landslides happened at the site of the Dariali hydropower construction. (Original image by Iago Kazalikashvili.)

Al Jazeera visited Georgia’s hydropower projects to report on constructions in seismically active areas.

Resettlement and lack of legal protection

Georgian communities that face hydropower projects have difficulties protecting their rights as affected stakeholders and landowners.

  • Georgia’s legislation does not address the issue of involuntary resettlement caused by infrastructure projects.
  • The Environmental Impact Assessment (EIA) system is ineffective in Georgia, both in terms of providing the public with information and opportunities for public participation (pdf).
  • An unclear legal rights regime offers no or minimal protection for communities that make customary use of land that traditionally was in their hands. Unregistered land plots can literally be grabbed by investors for infrastructure projects.

In addition to the threat of losing their land or being resettled, farmers may have to face reduced access to water for irrigation or higher risk of flooding due to dam constructions. Both exposes them to an increased food insecurity.

Read more

Involuntary resettlement in Georgia – an overview

Green Alternative Study | 2012

Related projects

Shuakhevi hydropower plant, Georgia

Georgia’s biggest and one of the most controversial hydropower plants is mostly famous for its failures. Two months after becoming operational in 2017 its tunnels collapsed. And after two years of repairs water is leaking from the dam. Shuakhevi hydropower plant (HPP) once promised to bring energy independence to Georgia. Instead it managed to collect an impressive ‘portfolio’ of problems in a wide range of areas: from biodiversity, to gender impacts, to community relations.


Nenskra hydropower plant, Georgia

The Nenskra dam is the largest of Georgia’s massive plans for hydropower installations in the Upper Svaneti region. If realized, it will deprive the local indigenous communities of their ancestral lands and traditional livelihoods, and cause an irreversible damage to the fragile river and mountain ecosystems.


Svaneti-panorama.jpg

Khudoni hydropower plant, Georgia

While a mountain community will have to be forced to resettle for this mega-project, the opaque ownership and weak taxation mean that benefits for Georgia are highly doubtful.


Latest news

Albania’s Skavica dam can’t get off the ground – time to finally cancel it!

Blog entry | 24 November, 2025

The highly damaging hydropower project could hardly have had stronger political support at its inception, with the country’s parliament passing a special law in 2021 to appoint U.S. construction giant Bechtel as the main contractor. But four years later, the project has stagnated, with no environmental permit and no financing.

Read more

Romania’s Parliament paves the way for environmental destruction and ‘foreign agent’ repression

Blog entry | 20 October, 2025

Romania stands at a dangerous crossroads. Last week, a law initiated by the senator Daniel Zamfir in 2022 and already then rejected by the Senate, passed by a crushing majority (262–33) in the decisive Deputies Chamber.

Read more

Expanding the Emerald Network: Progress and gaps in the Western Balkans

Blog entry | 9 October, 2025

At the 15th meeting of the Bern Convention’s Group of Experts on Protected Areas and Ecological Networks – held from 7 to 8 October 2025 in Bar, Montenegro – participants reviewed progress towards establishing the Emerald Network of protected areas. As part of the programme, the group visited Lake Skadar, one of Montenegro’s key Emerald sites, acknowledging the government’s efforts to safeguard this unique ecosystem.  

Read more

  • 1
  • 2
  • 3
  • 4
  • ...
  • 44
Next Page »

Related publications

Enquiry regarding the Natura 2000 assessment process of the Ombla hydropower plant

Advocacy letter | 27 February, 2012 | Download PDF

More information on the Ombla hydropower plant project is available on our website. The EBRD replied to our enquiry on March 1, 2012. Their answer can be downloaded as pdf.


Khudoni hydropower plant – a risky deal

Briefing | 21 November, 2011 | Download PDF

The proposed Khudoni hydro power plant poses the risk of an ecological disaster in one of the most amazing highland regions of Georgia. Additionally, the economic justification of the project is doubtful because the contract with the completely unknown, offshore Virgin Islands registered Georgian-Indian Company Transelectrica Ltd, is based on the BOO (Build-Own-Operate) principle that does not promise any significant income for the Georgian budget.


Official complaint to EBRD: Ombla hydropower project, Croatia

Official document | 17 November, 2011 | Download PDF

More information on the project is available here.


« Previous Page
  • 1
  • ...
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
Next Page »

Footer

CEE Bankwatch Network gratefully acknowledges EU funding support.

The content of this website is the sole responsibility of CEE Bankwatch Network and can under no circumstances be regarded as reflecting the position of the European Union.

Unless otherwise noted, the content on this website is licensed under a Creative Commons BY-SA 4.0 License

Your personal data collected on the website is governed by the present Privacy Policy.

Get in touch with us

  • Bluesky
  • Email
  • Facebook
  • Instagram
  • LinkedIn
  • RSS
  • YouTube