Kamengrad lignite power plant, Bosnia-Herzegovina
An idea to build a power plant at the open-cast Kamengrad coal mine near Sanski Most in the Federation of Bosnia and Herzegovina has been around for years, but in November 2017 it took a step forward with the signing of a Memorandum of Understanding between Energy China International and the construction supplier Lager d.o.o. for a 2 x 215 MW plant.

Stay informed
We closely follow international public finance and bring critical updates from the ground.
Background
CANCELLED: An idea to build a power plant at the open-cast Kamengrad coal mine near Sanski Most in the Federation of Bosnia and Herzegovina has been around for years, but in November 2017 it took a step forward with the signing of a Memorandum of Understanding between Energy China International and the construction supplier Lager d.o.o. for a 2 x 215 MW plant.
Few details are available about the plant, and it has no environmental permit and no financing. As with other plants across the region, unrealistic employment promises have already been made. In December 2017 head of the Sanski Most District Faris Hasanbegović stated that it would provide 1000 workplaces.
This does not appear to have convinced local people, however. As it would be a new power plant, it has attracted much more opposition locally than most other planned plants in the country. Sanski Most is located on the beautiful river Sana and prides itself on having no fewer than nine rivers in the district altogether. As a scenic and green area many of its residents feel that the power plant will spoil its potential for agriculture and tourism rather than bringing prosperity.
At a public debate on the adoption of the Una-Sana Canton spatial plan in August 2018, Sanski Most residents and the local council demanded the removal of the power plant project from the plan. This was carried out, although the plan was never adopted. In November 2019, another presentation of the Kamengrad coal power plant project appeared on the agenda of the Sanski Most Municipal Council. However, the meeting was cancelled after public pressure.
Another issue is that the concession for the mine was awarded to Lager d.o.o. after a bankruptcy procedure was carried out for the previous operator, RMU Kamengrad, but in 2017 the bankruptcy decision was declared illegal by the Constitutional Court of Bosnia and Herzegovina and returned to the Una-Sana Canton court.
As of early 2026 the plant is very unlikely to go ahead and does not appear in Bosnia and Herzegovina’s ten-year network development plans, so we consider it cancelled.
Latest news
Energetska zajednica ponovo je upozorila delegate u FBiH parlamentu
Bankwatch in the media | 26 February, 2019Energetska zajednica zahtijeva da Parlament Federacije BiH odgodi glasanje o nezakonitoj garanciji za blok 7 TE Tuzla Energetska zajednica ponovo je upozorila delegate u FBiH parlamentu
Read moreAlarmantan izvještaj: Hrvatsku truju termoelektrane iz BiH i Srbije
Bankwatch in the media | 26 February, 2019CLIMATE Action Network (CAN), vodeći europski savez više od 150 nevladinih udruga koje se bave borbom protiv klimatskih promjena, promovirao je nedavno u Bruxellesu u suradnji s još nekoliko organizacija zanimljiv izvještaj o utjecaju termoelektrana na ugljen na Zapadnom Balkanu. Alarmantan izvještaj: Hrvatsku truju termoelektrane iz BiH i Srbije
Read moreBosnia-Herzegovina politicians defy investigation to approve Chinese loan guarantee for coal power plant
Press release | 26 February, 2019The Federation of Bosnia-Herzegovina Parliament looks set to approve a loan guarantee for a EUR 614 million China Exim Bank loan for the Tuzla 7 coal power this Thursday, 28 February, [1], despite an ongoing Energy Community investigation into its compliance with State aid legislation.
Read moreRelated publications
Electricity market integration needs environmental compliance: Joint civil society position paper on CBAM and the Western Balkans electricity sector
Report | 19 March, 2026 | Download PDFThe inclusion of electricity in the EU’s Carbon Border Adjustment Mechanism (CBAM) has raised questions about CBAM’s impacts on EU-Western Balkans market integration.
The weakest link: Towards a transmission grid that supports decarbonisation in the Western Balkans
Briefing | 26 February, 2026 | Download PDFFor the Western Balkan countries to speed up their energy transformation, it is crucial to improve their transmission grids.
Priority measures for energy efficiency in buildings: Discussion paper on energy poverty, energy sufficiency and deep renovation in the Western Balkans
Discussion paper | 27 January, 2026 | Download PDFIn the Western Balkans, buildings use more than 40% of energy, and they are poorly insulated, inefficient and reliant on outdated heating systems, leading to energy waste.