• Skip to primary navigation
  • Skip to main content
  • Skip to footer

Bankwatch

  • About us
    • Our vision
    • Who we are
    • 30 years of Bankwatch
    • Donors & finances
    • Get involved
  • What we do
    • Campaign areas
      • Beyond fossil fuels
      • Rights, democracy and development
      • Finance and biodiversity
      • Funding the energy transformation
      • Cities for People
    • Institutions we monitor
      • European Bank for Reconstruction and Development
      • European Investment Bank
      • Asian Infrastructure Investment Bank
      • Asian Development Bank (ADB)
      • EU funds
    • Our projects
    • Success stories
  • Publications
  • News
    • Blog posts
    • Press releases
    • Stories
    • Podcast
    • Us in the media
    • Videos
  • Donate

Home > Projects > Kostolac B power plant (B1, B2), Serbia

Kostolac B power plant (B1, B2), Serbia

The Kostolac B power plant, consisting of 2 units of 350 MW each, first started operating in 1987. In 2024, the plant delivered 4359 GWh of electricity to the grid, around 14 per cent of the country’s coal-based generation.


Photo: Kostolac B power plant, Serbia, Dec 2021.

Stay informed

We closely follow international public finance and bring critical updates from the ground.





Background

Serbia’s energy utility EPS secured financing for a complete overhaul of Kostolac B1 and B2 in December 2011. A USD 293 million loan was taken by the Government of Serbia on behalf of EPS from China Exim Bank to equip the two units with flue gas desulphurisation (de-SOx) technology and bring the plant’s SO2 emissions in line with the Large Combustion Plant Directive. This should have been done by the time the Directive entered into force in January 2018. The company contracted for the works was the China Machinery and Engineering Corporation (CMEC), the same company which has built a new unit at Kostolac B. 

The works were finalised in July 2017, according to the Government. However, EPS’ 2018 Environmental Report shows that the application for a construction permit for the de-SOx installation was submitted only in November 2018 – more than a year after the opening ceremony for the facility. The permit was actually rejected twice – once in December 2018 and once in January 2019 – although the grounds on which rejections were issued by the Serbian authority are unknown. 

The only explanation we received at the time from EPS and the Serbian Ministry of Energy and Mining was that the gypsum landfill was not ready for the de-SOx to start operation. 

In December 2019, EPS launched a public consultation for an ‘updated’ Environmental Impact Assessment (EIA) report for the desulphurisation unit at Kostolac B, and public consultations were held in January 2020. The decision approving this new EIA for the already built de-SOx facility was made in August 2020. 

In April 2021, the Ministry of Mining and Energy announced that in fact the facility has been operating in testing mode since October 2020 but annual emissions in 2020 were much higher than those in the previous year. Kostolac B released 95,097 tonnes of SO2 in 2020, which was enough to breach the national – not plant level – 2020 ceiling for this pollutant by 1.74 times.

In 2021, the plant finally started to decrease its sulphur dioxide emissions. It emitted 26,015 tonnes of SO2 – a significant reduction compared to 95,097 tonnes in 2020 – but still 1.6 times as much as allowed. However, in 2022 and 2023, its SO2 emissions increased, emitting nearly 5.8 times as much as allowed in 2023.

Since the period between the start of testing and requesting the operating permit for the desulphurisation equipment could not legally be longer than a year, EPS requested an operating permit in October 2021. The Ministry neither approved nor rejected this, so EPS made several more requests before finally obtaining the operating permit in January 2023. 

In 2024, Kostolac B finally started to decrease its emissions, but it still emitted 2.3 times as much as allowed, or 15,218 tonnes. 

Latest news

Western Balkan governments must finally penalise illegal coal pollution – new report

Press release | 22 June, 2026

In 2025, systematic law enforcement failures allowed sulphur dioxide (SO2) emissions from the Western Balkans’ ageing coal power plants to exceed legal limits by 6.6 times, according to the eighth edition of Bankwatch’s Comply or Close report, published today (1). Nitrogen oxides (NOx) emissions also continued to breach legal limits, while dust pollution increased, reaching the highest level since the current rules entered force in 2018.

Read more

The Trump peace pipelines framework: a renewed threat to Western Balkan decarbonisation

Blog entry | 19 June, 2026

The Western Balkan countries have low or no fossil gas dependence, but the United States is trying to change this. As a major gas producer, its approach to the region is increasingly clashing with the EU’s decarbonisation agenda, raising the threat of increased import dependence or stranded assets.

Read more

Power to the people: How distribution grid improvements can speed up energy transformation in the Western Balkans

Blog entry | 23 April, 2026

The key to long-term sustainability of the energy transition is a decentralised electricity generation system where everyone can be an active participant and share the benefits. For this to happen, the distribution grids that connect end consumers to the system need to be bidirectional, stable, modern and smart.

Read more

  • 1
  • 2
  • 3
  • 4
  • ...
  • 201
Next Page »

Related publications

The village of Junkovac near the Kolubara mine – neglected and destroyed

Briefing | 9 May, 2014 | Download PDF

The story of Junkovac in Serbia highlights systemic violations of human rights, neglect and wrong doings in the lignite mining sector that have not changed since the involvement of the European Bank for Reconstruction and Development began in 2000. One of most recent cases of violations of human and property rights involves the illegal dumping of overburden from the mines at the Junkovac site that for years has been a threat to the properties and lives of hundreds of people in the nearby village.


Legal opinion on the possible financing scheme of Plomin C and its compatibility with EU rules on state aid and public procurement (public summary)

Briefing | 5 May, 2014 | Download PDF

This legal analysis argues that the tender arrangement for the Plomin C coal-fired power plant seriously questions the feasibility of the entire investment, not just from an environmental point of view as demonstrated by Zelena Akcija beforehand, but by now also from a competition point of view.


Whose Energy Community? Treaty improvements urgently needed

Bankwatch Mail | 20 March, 2014 |

The EU-backed Energy Community Treaty, signed in 2005 and comprising the western Balkan countries, Ukraine and Moldova, has been widely hailed as encouraging regional co-operation. It also sets a legislative framework for the signatories (also known as the contracting parties) that should contribute, along with the EU accession process, to addressing the environmental and social impacts of the energy sector. Indeed, examples of the Energy Community’s added value are its adoption of renewable energy targets in October 2012, as well as a requirement for power plants to comply with EU emissions limits.


« Previous Page
  • 1
  • ...
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • ...
  • 53
Next Page »

Footer

CEE Bankwatch Network gratefully acknowledges EU funding support.

The content of this website is the sole responsibility of CEE Bankwatch Network and can under no circumstances be regarded as reflecting the position of the European Union.

Unless otherwise noted, the content on this website is licensed under a Creative Commons BY-SA 4.0 License

Your personal data collected on the website is governed by the present Privacy Policy.

Get in touch with us

  • Bluesky
  • Email
  • Facebook
  • Instagram
  • LinkedIn
  • RSS
  • YouTube