Komarnica hydropower plant, Montenegro
Planned by Montenegro’s state-owned electricity utility EPCG, the need for the Komarnica hydropower plant has never been proven.
Credits: Dobrica Mitrović
Stay informed
We closely follow international public finance and bring critical updates from the ground.
Key facts
- Capacity: 172 MW, generating 213 GWh of electricity annually
- Planned 45 km upstream of the existing 342 MW Piva hydropower plant.
- In February 2022, it was confirmed that state-owned electricity utility Elektroprivreda Crne Gore (EPCG) would receive a concession for the project.
- Project cost: EUR 246.5 million
- As of early 2022, no financing has been secured.
Key issues
- The need for another peaking hydropower plant in Montenegro has not been proven and the country is lagging behind with tackling energy wastage and developing solar power.
- It would destroy the precious Komarnica valley, which is protected by law and is a proposed extension of Durmitor National Park Unesco Heritage site.
- The project’s environmental impact assessment admits that harm would be done but sees it as justified by the project being in the ‘public interest’.
- No ‘appropriate assessment’ has been done under the EU Habitats Directive.
- Lack of information available to the public on the project’s feasibility.
Background
The 172 MW Komarnica hydropower project is planned to be built on the river Komarnica, 45 km upstream of the existing 342 MW Piva power plant in Montenegro. The project would feature a 171 m high concrete arch dam that would impound a 17.6 km long reservoir. As a peaking plant, it is expected to generate only 213 GWh of electricity annually (compared to an average of 860 GWh generated by the Piva plant).
Lack of justification for the project
Plans to build a hydropower plant on the Komarnica have been around since the 1970s, but have been vigorously revived in recent years after EPCG’s other flagship projects – the Pljevlja II coal plant and the Morača hydropower plants – proved uneconomic and were shelved.
However, it is unclear why Montenegro, which already generates 40-60 per cent of its electricity from hydropower, depending on rain and snowfall, needs yet another hydropower plant, and no evidence of Komarnica’s economic viability is available to the public. A system with such a high percentage of hydropower is already highly vulnerable to climate change, as can be seen from its wide annual fluctuation in generation. This is all the more so because the Piva plant already works as a peaking plant. Surely Montenegro needs diversification of its renewable energy sources much more than it needs another hydropower plant, especially as plans for its first large-scale solar plant at Briska Gora have stagnated.
Damage to protected areas
The project would flood part of the Komarnica candidate Emerald Site (ME000000P) and the Dragišnica and Komarnica Regional Park. The area is also part of three potential Natura 2000 sites: Bukovica Valley and Vojnik Mountain under the Birds Directive and the Komarnica and Pridvorica sites under the Habitats Directive.
Moreover, the Komarnica river has been identified as a potential area for the expansion of the Durmitor National Park and UNESCO site, but so far has only been awarded a weaker ‘Regional Park’ status.
The area is home to numerous protected species, including wolves, bears, Balkan chamois, otters, stone crayfish, golden eagles, rock partridges and corncrakes. Yet the full extent of the likely damage by the project is not yet known due to only partial fieldwork having been done.
Unique caves and cliffs would be flooded before their biodiversity is even properly researched.
Poor quality environmental impact assessment
The project’s environmental assessment, published in February 2022, reads more like an advertisement brochure than a scientifically grounded study. It promises the people of Šavnik a golden future based on an influx of tourists who will allegedly visit because of the hydropower plant, but offers no evidence on why or how exactly this will happen. Experience from the town of Plužina, near the existing Piva hydropower plant, rather suggests that the hydropower plant will hinder tourism.
Moreover, although the environmental assessment admits that the hydropower plant will damage biodiversity, it claims that the harm done by the project would supposedly be outweighed by its economic and social benefits.
As an EU candidate country, Montenegro has to a certain extent transposed the EU’s nature protection laws, though it has not made a final selection of Natura 2000 protected areas yet. In any case, it has a duty to protect its candidate Emerald sites under the Bern Convention and must carry out an ‘appropriate assessment’ for any project which may significantly impact an Emerald site or Natura 2000 site. If it is found that the impact will be significant, the project may not go ahead unless a specific assessment finds it to be a project of ‘overriding public interest’. But the Komarnica environmental impact assessment does not include any ‘appropriate assessment’ at all.
Similarly, projects that would degrade the river’s status are not allowed under the EU Water Framework Directive unless they obtain the right to a derogation under Article 4(7) of the Directive. Again, a detailed assessment is needed, which has not been carried out in the case of Komarnica.
Latest news
Powerline to nowhere: Georgian villages take stand against badly routed transmission lines
Blog entry | 13 June, 2017Mountain villages in the country’s northeast protest for changes to the routing of high voltage lines in a series of local protests.
Read moreLocals oppose dam that is set to endanger critical fish habitat in Bosnia-Herzegovina
Blog entry | 30 May, 2017We are passing through the canyon of the river Vrbas, in north-west Bosnia-Herzegovina. I am looking through a car window, mouth wide open in awe. While I look up to the rocky, edgy peaks hundreds of meters above and down to the heavenly blue river, I
Read moreWho really benefits from Georgia’s Nenskra hydropower plant?
Blog entry | 4 May, 2017The Nenskra hydropower plant is implemented by two state-owned institutions and likely to be funded by several publicly owned development banks. Nonetheless, information about the contested project is being held back from public scrutiny.
Read moreRelated publications
The Upper Horizons complex, Bosnia and Herzegovina
Briefing | 18 December, 2023 | Download PDFThe Upper Horizons hydropower complex has been planned since the mid-20th century, and is planned to consist of three plants — Dabar, Nevesinje and Bileća — linked by a series of tunnels and channels. If completed, it would have a devastating impact on the karst ecosystems of eastern Herzegovina and beyond.
The Ulog hydropower plant on the river Neretva, Bosnia and Herzegovina
Briefing | 18 December, 2023 | Download PDFThe Ulog plant, with a 53-metre high dam, is currently being built on the upper Neretva in the Republika Srpska entity of Bosnia and Herzegovina, in the middle of a nominated candidate Emerald site – an area which should be protected under the Bern Convention.
Joint Statement On the Expansion of the Emerald Network in Countries of the Western Balkans by scientists and representatives of NGOs
Statement | 13 February, 2023 | Download PDFIn early December 2022, 39 scientists and representatives of NGOs from Albania, Austria, Bosnia and Herzegovina, Bulgaria, Croatia, Germany, Greece, Montenegro, North Macedonia, Serbia and Switzerland joined efforts to prepare a shadow list and a map o