• Skip to primary navigation
  • Skip to main content
  • Skip to footer

Bankwatch

  • About us
    • Our vision
    • Who we are
    • 30 years of Bankwatch
    • Donors & finances
    • Get involved
  • What we do
    • Campaign areas
      • Beyond fossil fuels
      • Rights, democracy and development
      • Finance and biodiversity
      • Funding the energy transformation
      • Cities for People
    • Institutions we monitor
      • European Bank for Reconstruction and Development
      • European Investment Bank
      • Asian Infrastructure Investment Bank
      • Asian Development Bank (ADB)
      • EU funds
    • Our projects
    • Success stories
  • Publications
  • News
    • Blog posts
    • Press releases
    • Stories
    • Podcast
    • Us in the media
    • Videos

Home > Publications

Publications

Report


Dead end ahead: How gas plans are distracting the Western Balkans from the energy transition


This briefing provides an update on gas build-out plans in the Western Balkans since March 2023 and finds that they have remained remarkably steady in the last two years, despite increasing risks and financing challenges.

  • 1
  • 2
  • 3
  • 4
  • 5
Topics
10 February 2021
District heating – the role of EU investments in Latvia

Heating is a basic need in Latvia, where the average heating season lasts 200 days. More than half (58%) of Latvia’s primary energy consumption is used for heating. This report from Bankwatch and Green Liberty analyses the district heating projects implemented in Latvia with…

3 February 2021
A letter to the EBRD on Green Cities

Bankwatch and six of our NGO partners jointly drafted a letter and shared it with EBRD outlining the issues attached to specific cases we are following, as well as our recommendations to help EBRD infrastructure funding serve the needs of the communities and the environment….

29 January 2021
Corridor Vc in Bosnia and Herzegovina

The transport Corridor Vc is a motorway planned to run for 330 kilometers through Bosnia and Herzegovina. Various sections of this corridor are being financed by the EIB and the EBRD. This briefing provides an overview of the key issues identified by a Bankwatch fact finding…

29 January 2021
Nenskra hydropower project: update

Since it was first proposed, the Nenskra hydropower project in Georgia has raised significant controversy and concerns among the indigenous Svan communities living near the proposed plant, as well as the general public in Georgia. The accountability mechanisms of the EIB, EB…

29 January 2021
Raising the bar on human rights at the European Investment Bank

A joint letter from Bankwatch and 15 other NGOs, on the occasion of the EIB’s annual dialogue with Civil Society Organisations, asking the Bank takes steps to integrate and prioritize human rights considerations through its operations.

28 January 2021
Making the “EU Climate Bank” a reality

A joint letter from Bankwatch and 46 other civil society groups, calling on the EIB leadership to close the gaps in the Bank’s ‘Climate Bank Roadmap 2021-2025’ and fully align its operations with the Paris Agreement.

28 January 2021
Raw Deal

Europe wants to be the first continent to become climate neutral by 2050 and the leader in ensuring that all of the world’s ecosystems are restored, resilient and adequately protected by 2050.

27 January 2021
Renewable energy incentives in the Western Balkans

Progress towards compliance with EU state aid rules and preventing environmentally harmful subsidies.

26 January 2021
Connecting or Dividing? The South Mostar section of Corridor Vc in Bosnia and Herzegovina

In the early 2000s, the Corridor Vc route south of Mostar was planned to run through the Neretva valley, but due to strong local opposition, in 2011 this was changed to a route on the nearby plateau. In 2015 and 2016, yet another decision was made to return the route down in…

12 January 2021
CEE Bankwatch Network additional input for the EEAG public consultation

CEE Bankwatch Network additional input for the EEAG public consultation

18 December 2020
Pollution of land, surface and groundwater near the slag and ash disposal site of Tuzla thermal power plant 

From 1 March – 31 August 2020, an analysis of water and soil samples was conducted in the area of influence of the closed slag and ash disposal sites in Tuzla, Bosnia and Herzegovina (BiH) – Plane, Divkovići I, Divkovići II, Drežnik and Jezero I – as well as wastewater sampl…

14 December 2020
Pathways for Just Transitions in South East Europe

This policy paper is a companion piece to “Accelerated Lignite Exit in Bulgaria, Romania and Greece”, a report published in May 2020 modelling the impact of the early retirement of some coal and all lignite power plants in the electricity sector in the three countries.

  • 1
  • ...
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • ...
  • 149
  • >

Footer

CEE Bankwatch Network gratefully acknowledges EU funding support.

The content of this website is the sole responsibility of CEE Bankwatch Network and can under no circumstances be regarded as reflecting the position of the European Union.

Unless otherwise noted, the content on this website is licensed under a Creative Commons BY-SA 4.0 License

Your personal data collected on the website is governed by the present Privacy Policy.

Get in touch with us

  • Bluesky
  • Email
  • Facebook
  • Instagram
  • LinkedIn
  • RSS
  • YouTube