Kolubara B lignite-fired power plant, Serbia
The Kolubara B thermal power plant site is situated near Kalenic village, 60 km south-west of Belgrade, at the northern side of the Tamnava Open Cast Mine. The decision to build the 2 x 350 MW plant was taken in 1983 and construction started in 1988. Construction progressed slowly until 1992, when work was suspended due to sanctions against Serbia. At this stage, about 40 per cent of the facility had already been constructed, partly with the assistance of a World Bank loan.
The existing Kolubara A power plant. Power plants within the Kolubara complex already produce more than 50 percent of Serbian electricity.
Stay informed
We closely follow international public finance and bring critical updates from the ground.
Background
Rising from the dead
In 2011 the results of an international tender were announced, in which Italian utility Edison was the only company to submit a bid. Edison’s offer was accepted, and a joint venture agreement signed with Elektroprivreda Srbije on the development of the Kolubara B project in June 2011.
In the meantime, in July 2011 the European Bank for Reconstruction and Development (EBRD) approved an EUR 80 million loan to provide new equipment for the Kolubara lignite mines. For more information about the project see here.
Although in March 2012 the EBRD announced that it was considering investing in the Kolubara B plant, on 6 September 2013, it confirmed to Bankwatch by email that it was no longer examining participation in the project.
For several years, the Kolubara B project appeared to be history. Yet in August 2018, the Minister of Mining and Energy that a working group had been formed to move the project forward. In November 2019, the Minister further announced that a technical study had been completed, which indicated the feasibility of completing the project. In early 2020 a preliminary construction agreement was signed with PowerChina and project-level spatial planning was launched.
Dead again
In May 2021, Serbian media reported that the project had once again been cancelled, this time at the request of the Minister for Energy and Mining.
Long-term problems with corruption at Kolubara
The existing Kolubara mine has frequently been associated with corruption and mismanagement and years of EBRD support for EPS do not seem to have changed this. On 9 September 2013, it was reported that the police had arrested the former director of the Kolubara Mining Basin, Nebojsa Ceran, former financial director Ljubisa Nekic, businessman Radoslav Savatijevic, and several other individuals. The arrestees are suspected of fraud in land expropriation proceedings around the Kolubara mine.
These were not the first cases of corruption in Kolubara. Together with 27 others, in April 2012, Dragan Tomic, former director of the Kolubara coal mine was charged with embezzling USD 11 million from Kolubara between 2006 and 2007. Tomic allegedly paid private companies for unnecessary mining equipment and services. Kolubara was overcharged for the number of hours put in by the private companies, and Kolubara executives did not follow appropriate public procurement procedures. The court hearings started only in 2017 and as of early 2024, appear to still be ongoing. In July 2022 Insajder broadcast a TV show looking at the case and why it is taking so long to conclude.
Latest news
Serbia: key national plan risks cementing coal dependence
Blog entry | 29 June, 2021The Serbian government’s 15-year national Spatial Plan is so keen to stick to business-as-usual it is openly ignoring some of the country’s most pressing issues to justify plans for six new fossil fuel-based power plants. Belgrade also doesn’t appear to care much about what Serbia’s neighbour to the east thinks regarding the implications these disastrous plans would have for them.
Read moreCancellation of Serbia’s Kolubara B coal plant opens space for decarbonisation
Blog entry | 26 May, 2021Earlier this week, Serbian media announced that plans for the new 350 MW Kolubara B coal power plant have been halted. This is a strong demonstration of political will as the Ministry for Mining and Energy seeks to steer the country towards energy transition. Several more courageous moves will be needed to cement this path and make sure no-one is left behind.
Read moreHow Serbia’s addiction to coal could cloud its future in Europe
Bankwatch in the media | 21 November, 2020Source: How Serbia’s addiction to coal could cloud its future in Europe
Read moreRelated publications
Issues with Serbian electricity company EPS need to be addressed within new EBRD loan
Briefing | 1 February, 2016 | Download PDFAs part of its new EUR 200 million loan to the Serbian electricity company EPS, the European Bank for Reconstruction and Development aims to assist with “identifying opportunities to improve environmental, safety, social, and labour governance and capacity, and on helping EPS to develop a more strategic approach to managing these issues”. As outlined in this briefing, so far the EBRD’s fifteen-year partnership with EPS has not brought visible improvements in company practices and it is high time for the bank to prove that its engagement can add value.
Greening the EBRD’s portfolio – or greenwashing it
Bankwatch Mail | 17 December, 2015 |No matter how you look at it, the so-called sustainable energy approach being taken – and loudly trumpeted – by the European Bank for Reconstruction and Development (EBRD) is simply at odds with both climate science and the recently adopted Sustainable Development Goals (SDGs).
A clear and present danger – How financial institutions and authorities have failed to address the human impacts of resettlement in Serbia’s lignite mining fields
Study | 25 September, 2015 | Download PDFThis study shows how the European Bank for Reconstruction and Development has failed to enforce several of its basic principles on involuntary resettlement in the Kolubara Mining Basin, one of the largest sources of lignite in Europe, where mining has continued for over fifty years.